Drilling Construction Technology of ZK001 Parameter Well for Potassium Salt Survey in Xuanhan County of Sichuan Province
DOI:
CSTR:
Author:
Affiliation:

113 Geological Team of Sichuan Bureau of Geology and Mineral Resources,113 Geological Team of Sichuan Bureau of Geology and Mineral Resources,113 Geological Team of Sichuan Bureau of Geology and Mineral Resources

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    With the background of well ZK001 drilling project for potassium salt survey Xuanhan County of Sichuan Province, the drilling construction technology of potassium salt parameter well is summarized in well structure, drilling tools combination, drilling fluid technology, coring technology, well deviation control and deep pumping tests. In view of the technical difficulties such as super-long open hole drilling, hole leakage and long-section gypsum salt layer drilling in the construction process, by the countermeasures of optimizing drilling tools combination, adjusting the performance of drilling fluid

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 12,2018
  • Revised:March 12,2018
  • Adopted:July 04,2018
  • Online: August 07,2018
  • Published:
Article QR Code