Wall Protection and Plugging Technology for Bayingou Coalbed Methane Exploration in Xinjiang
DOI:
Author:
Affiliation:

The Seventh Geological Brigade of Xinjiang Geology and Minerals Bureau,The Seventh Geological Brigade of Xinjiang Geology and Minerals Bureau,The Seventh Geological Brigade of Xinjiang Geology and Minerals Bureau,The Seventh Geological Brigade of Xinjiang Geology and Minerals Bureau

Clc Number:

P634.6

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    During the construction of solid core drilling in coalbed methane exploration well, when encountering the tectonic development of rock strata and developed underground water system, multi-layer leakage and difficult wall protection often happen. Because of the special requirements for logging operation in coalbed methane exploration wells, the wall protection and plugging become the key of drilling construction. In the process of wall protecting and plugging treatment, some improper technical methods and incorrect calculation can lead to the failure, even cause major drilling accident. By the summary of the construction experience of the work area, the feasible technical measures of wall protection and plugging are put forward, which provide reference for the similar stratum drilling exploration and construction.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 26,2018
  • Revised:May 08,2018
  • Adopted:May 10,2018
  • Online: June 15,2018
  • Published: