Optimization Method for Offshore Same Layer Sidetracking Scheme
DOI:
CSTR:
Author:
Affiliation:

CNOOC EnerTech-Drilling & Production Co.,CNOOC EnerTech-Drilling DdDd Production Co.,CNOOC EnerTech-Drilling DdDd Production Co.,CNOOC EnerTech-Drilling DdDd Production Co.,CNOOC EnerTech-Drilling DdDd Production Co.

Clc Number:

TE243 .9

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to evaluate the economy of openhole cementing sidetracking in the same layer and openhole sidetracking in casing to optimize the way of sidetracking, the conventional design and operation processes of 2 wells by the same layer sidetracking are introduced. The period of screen pipe fishing in well abandonment and the economy of openhole cementing sidetracking are analyzed, by establishing a decision graph of sidetracking scheme, the key factors affecting the economy of sidetracking are seeked out, and the calculation method concluded for the economic construction period of screen pipe fishing and critical surplus construction period of the economy can be used as the decision basis for whether the screen pipe fishing scheme should be adjusted or not.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 26,2018
  • Revised:April 20,2018
  • Adopted:April 27,2018
  • Online: August 07,2018
  • Published:
Article QR Code