Control Measures of Hole Completion Construction for Super-long Hollow Piles in Fuyang
DOI:
CSTR:
Author:
Affiliation:

Beijing Vibrofloataion Engineering Co., Ltd.

Clc Number:

UT473.1 4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In a pile foundation project in Fuyang, the originally planned construction at the foundation pit bottom is changed to be on the ground, and nearly 14m hollow piles should be added in adition. Therefore, some related problems affecting the construction quality of engineering pile are produced, such as pile location, slag thickness at hole bottom, position of reinforcement cage, concrete quality, elevation of concrete pile top and so on. This paper introduces the construction situation, and the experience can be used as reference for similar projects.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 19,2018
  • Revised:May 29,2018
  • Adopted:May 30,2018
  • Online: July 09,2018
  • Published:
Article QR Code