Trenching Construction Technology of Underground Diaphragm Wall by YCJF-20 Percussive and Reverse Circulation Rig
DOI:
CSTR:
Author:
Affiliation:

No.1 Institute of Geology and Mineral Resources of Shandong province,No.1 Institute of Geology and Mineral Resources of Shandong Province,No.1 Institute of Geology and Mineral Resources of Shandong Province,No.1 Institute of Geology and Mineral Resources of Shandong Province,No.1 Institute of Geology and Mineral Resources of Shandong Province,No.1 Institute of Geology and Mineral Resources of Shandong Province

Clc Number:

TU476 .3;P634.3 1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The trenching construction is an important process for underground diaphragm wall, YCJF20 percussive and reverse circulation rig is used in trenching construction of underground diaphragm wall in a station of Xiamen metro line 3. This paper introduces YCJF20 rig about its main technical parameters, characteristics and working principles, as well as the construction process of guide wall and guide hole, drilling rig layout, mud preparation and trenching by percussive drilling.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 25,2018
  • Revised:August 17,2018
  • Adopted:August 09,2018
  • Online: November 19,2018
  • Published:
Article QR Code