Construction Monitoring of Deep Foundation Pit of Comprehensive Station Area Sheared by Subway Station and High-speed Railway Station and the Analysis
DOI:
Author:
Affiliation:

Large Diameter Shield Co., Ltd. of China Railway Bureau 14 Group

Clc Number:

TU473.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Taking the foundation pit construction of the comprehensive station area sheared by a Nantong subway station and Nantongxi Station of Shanghai-Nantong railway as an example, this paper introduces the real time monitoring of the whole process of the foundation pit enclosure and the excavation in the construction of the deep foundation pit of a reserved Nantong rail transit station. Based on the analysis on the monitoring data, the enclosure and monitoring schemes are further demonstrated to ensure the safety of subway foundation excavation and railway viaduct construction in the same period.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 28,2018
  • Revised:June 13,2018
  • Adopted:June 14,2018
  • Online: July 09,2018
  • Published: