Analysis of ball movement and design of newpressure test body in downhole
DOI:
Author:
Affiliation:

1.Downhole Technology Service Branch, CNPC Bohai Drilling Engineering Co., Ltd., Tianjin 300283, China; 2.Engineering Technology Research Institute, CNPC Bohai Drilling Engineering Co., Ltd., Tianjin 300283, China; 3.Engineering Technology Research Institute, CNPC Bohai Drilling Engineering Co., Ltd.,Renqiu Hebei 062552, China

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the downhole operation of oil, gas and water wells, the ball is widely used for pipe pressure testing, sealing and multi-stage (layer) fracturing. In order to accurately calculate the time when the ball arrives at the design point (i. e., the waiting time), the new formula of the waiting time calculation is developed by analyzing the movement process and the forces of the ball. It is pointed out the key factors affecting the waiting time include the coefficient of resistance around the ball, the ball diameter and density, and fracturing fluid properties, which provides a basis for optimizing the construction design. At the same time, a new type of tubular pressure test body that can reduce the waiting time and backwashing time is proposed, laying the foundation for further construction optimization.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 02,2018
  • Revised:March 07,2019
  • Adopted:March 18,2019
  • Online: May 17,2019
  • Published: