Problems and Opinions on Budgetary Compilation of Geological Hazard Control Projects in Sichuan
DOI:
Author:
Affiliation:

Institute of Exploration Technology, CAGS,Institute of Exploration Technology, CAGS

Clc Number:

P694

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper introduces the problems often encountered in the budgeting process of the geological hazard management project in Sichuan Province, including the lack of precise understanding of policy documents, the large error in work quantity calculation, the unfamiliarity of the quota standard, the imperfection of design documents, the inadequate personnel communication and so on, and puts forward the related opinions.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 16,2018
  • Revised:July 16,2018
  • Adopted:July 20,2018
  • Online: September 30,2018
  • Published: