Study on how to improving drilling rates in Xujiahe formation of Fenshuiling structure in northeast Sichuan
Author:
Affiliation:

Drilling Engineering and Technology Research Institute, Zhongyuan Petroleum Engineering Co. Ltd, SINOPEC,Drilling Engineering and Technology Research Institute, Zhongyuan Petroleum Engineering Co. Ltd, SINOPEC,Logging Company, Zhongyuan Petroleum Engineering Co. Ltd, SINOPEC,Logging Company, Zhongyuan Petroleum Engineering Co. Ltd, SINOPEC,Southwest Drilling Company Zhongyuan Petroleum Engineering Co. Ltd, SINOPEC

Clc Number:

P634;TE243

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to solve the problem of low drilling rate in Xujiahe formation of Fenshuiling structure in northeast Sichuan, study has been carried out to improve drilling rates. First, the mineral components and rock mechanics parameters in Xujiahe formation have been obtained through analysis of the engineering geological characteristics. Then, the technical route and measures for speeding up drilling rates in Xujiahe formation have been specifically analyzed and discussed. Applications in F3 well have demonstrated that drilling rates increased in different degrees with use of gas drilling and the combined drilling of screw tool+ hybrid bit and torsional impact tool+ hybrid bit. Meanwhile, the highest average rate of penetration with gas drilling reached 4.78m/h, and increased by 4.49 times compared with conventional drilling.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 30,2018
  • Revised:October 30,2018
  • Adopted:January 07,2019
  • Online: January 31,2019
  • Published: