Influence of the foundation pit construction process in Yucheng on surrounding buildings
DOI:
Author:
Affiliation:

Geophysical Prospecting Institute of Shandong Province

Clc Number:

TU473.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In view of the grave influence on surrounding buildings due to the design and construction process of the Tongyu Yangguang Haoting foundation pit support project, some measures were taken to ensure the smooth progress of the project, such as optimization of the construction process and construction sequence according to the stratum and surrounding environment, adoption of jet grout expanded anchor cables, change of the support pile drilling and rebar cage lowering methods, local adoption of the SMW method, intensification of monitoring during construction. The construction experience can be used as a reference for similar projects in the future.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 17,2018
  • Revised:September 25,2019
  • Adopted:September 25,2019
  • Online: November 06,2019
  • Published: