Application of unequal length double-row piles in a foundation pit project in Wuhan
Author:
Affiliation:

1.Enshi Branch of China National Minda International Engineering Design Co., Ltd.;2.Wuhan Geological Prospecting Foundation Engineering Co., Ltd.;3.School of Civil Engineering and Architecture, Wuhan University of Technology

Clc Number:

TU473

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Taking the deep foundation pit support project of Wuhan Renheng Park Century as the research background, design calculation and analysis is conducted with Tianhan Design Software on some support section of the project, where the foundation pit was supported by unequal double-row piles, that is, the front row piles were longer and the rear row piles were shorter. The results of calculation and analysis shows that the maximum displacement of the front row and rear row piles of the support section is 37.9mm, that occurs at 1.0m below the ground (at the top of the pile), and the elastic resistance safety factor in the passive zone is 3.90. The early warning control index for the foundation pit of this project is the horizontal displacement of the supporting structure not greater than 40mm, which can meet the design monitoring requirements and provide reference for the future application of unequal length double-row piles in the foundation pit.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 10,2019
  • Revised:November 27,2019
  • Adopted:November 28,2019
  • Online: March 13,2020
  • Published: