Drilling technology for Well Chaoye1
Author:
Affiliation:

1.Brigade, Gansu Bureau of Coal Geology, Zhangye Gansu , China;2.School of Mathematics and Economics, Hunan University, Changsha Hunan , China;3.Resource and Environmental Engineering College, Guizhou University, Guiyang Guizhou , China;4.Beijing Institute of Exploration Engineering

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The Well Chaoye1 is the first shale gas resource survey well deployed in the Chaoshui Basin. It requires high quality coring. There are large sections of shale in the strata, which are easily hydrated and spalled, making drilling difficult. This article focuses on the experience of the coring process, bit selection, drilling fluids technology and well deviation control technology for the Well Chao1. Large-diameter wireline coring was used Chaoye1, and the full well section below the Quartenary formation was cored. Though there were very few cases with this technology for reference in Gansu, core recovery was achieved close to 90%. During the drilling process, by choosing reasonable drilling parameters and a drilling fluid with strong wall protection performance, the technical difficulties encountered in the formation such as formation slippage and poor wellbore wall stability were solved, and the smooth completion of the well was ensured.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 27,2019
  • Revised:June 11,2020
  • Adopted:June 12,2020
  • Online: October 23,2020
  • Published: