Discussion on key technology for the 3000m deep scientific drillingproject of Jiajika Lithium Mine in west Sichuan
CSTR:
Author:
Affiliation:

No Geological and Mineral Exploration Institute of Shandong Province, Yantai Shandong , China

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The 3000m deep scientific drilling project of Jiajika Lithium Mine in west Sichuan is located in the high-altitude areas of western Sichuan Province. According to the technical requirements, the borehole is designed with three drilling sections. A set of economical and practical drilling equipment was used, mainly including HXY9 drill rig, K2790 drilling tower,BW300/16 mud pump. Drilling technology, the coring method, the drilling assembly and the drilling fluid plan were examined and developed. For implementation of the concept of green exploration, necessary measures have been developed to protect the ecological environment of the construction site.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 11,2020
  • Revised:August 11,2020
  • Adopted:August 17,2020
  • Online: October 23,2020
  • Published:
Article QR Code