    Abstract:

    The Longquan Dingfeng Yicheng pile foundation project was featured of large pile diameter and high ultimate bearing capacity of the single pile where the maximum pile diameter was 2400mm, and the vertical ultimate bearing capacity of the single pile was 89600kN. There is little reference experience in the construction field. The pile foundation project mainly faced three challenges: easy caving in the sand layer and pebble layer, difficulty in bedrock penetration, and difficulty in clearing sediment. In reference to the pile foundation construction experience of bridges and railways in China, the key technologies such as stabilization of the sand layer and pebble layer, step reaming, bailing out hole bottom sediments, were purposely targeted to solve the construction problems. Testing after the waiting period showed that most of the bored piles were Class I piles. The summary of the construction experience of this project can provide reference for the application of large diameter rotary bored piles in the construction field.

    Reference
    [1]王云岗, 章光, 胡琦. 钻孔灌注桩孔壁稳定性分析[J]. 岩石力学与工程学报,2011, 30(S1): 3281-3287.(Wang Yungang,Zhang Guang, Hu Qi. Analysis of stability of bored pile hole-wall [J]. Chinese Journal of Rock Mechanics and engineering, 2011, 30(S1): 3281-3287.)
    [2]张忠苗, 吴世明,包 风. 钻孔灌注桩桩底后注浆机理与应用研究[J]. 岩土工程学报, 1999(06): 681-686.(Zhang Zhongmiao, Wu Shiming, Bao Feng. Study of mechanism and application on bored pile end grouting[J]. Chinese Journal of Geotechnical Engineering,1996(06): 681-686.)
    [3]付连红, 徐 斌, 王 恩. 大直径钻孔灌注桩施工常见事故处理与预防研究[J]. 城市建设理论研究(电子版), 2018(23): 122+91.(Fu Lianhong, Xu Bin, Wang En. Construction accidents and prevention research of large diameter bored pile[J]. Urban construction theory research(electronic edition), 2018(23): 122+91.)
    [4]朱栋文, 赵春风, 赵 程, 等. 泥浆比重对钻孔灌注桩孔径变化规律的影响[J]. 水利学报, 2015, 46(S1): 349-353.(Zhu Dongwen, Zhao Chunfeng, Zhao Cheng, et al. The influence of slurry gravity on the variation of the pore diameter in cast-in-situ bored pile[J]. Journal of Hydraulic Engineering, 2015, 46(S1): 349-353.)
    [5]JGJ 94-2008建筑桩基技术规范[S]. 2018. (JGJ—2008 Technical code for building foundation[S]. 2008. (in Chinese))
    [6]徐 云 博主编; 孙彦飞, 宋立峰副主编; 陈庆丰,韩瑞芳参编. 土力学与地基基础[A], 北京理工大学出版社,2016.08.(Xu Yun, Sun Yanfei, Song Lifeng, et al. Soil mechanics and foundation[A], Beijing institute of technology press, 2016.08.)
    [7]李满程, 杨 斌, 莫建军, 等. 桥梁大直径桩施工难点及其对策[J]. 长沙交通学院学报, 1999(01): 81-84.(Li Mancheng, Yang Bin, Mo Jianjun, et al. Construction difficulties and its counter-measures of big diameter piles in bridges[J]. Journal of Changsha Communications University, 1999(01): 81-84.)
    [8]张功英. 超厚砂层地质条件下的旋挖扩孔灌注桩施工技术应用[J]. 河南建材, 2020(01): 14-16.(Zhang Gongying. Application of construction technology of rotary drilling bored pouring pile under geological condition of ultra-thick sand layer[J]. Henan Building Materials 2020(01): 14-16.)
    [9]胡东范. 铁路桥梁大直径桩施工难点及对策[J]. 工程建设与设计, 2009(02): 103-105.(Hu Dongfan. Construction difficulties and countermeasures of large diameter piles for railway Bridges[J]. Construction & Design for Project, 2009(02): 103-105.)
    [10]左明福. 深水大直径钻孔灌注桩若干问题刍议[J]. 中国港湾建设, 2006(05): 33-35.(Zuo Mingfu. Discussion on Large Diameter Bored Piles in Deep Waters[J]. China Harbour Engineering, 2006(05): 33-35.)
    [11]陆大伟. 大直径钻孔灌注桩泥浆护壁工艺与质量[J]. 中国港湾建设, 2002(06): 35-39.(Lu Dawei. Technique and quality control of slurry to protect drilled bores for large diameter Bored Cast-in-Place Piles[J]. China Harbour Engineering, 2002(06): 35-39.)
    [12]张志华, 丁 杰. 钻孔灌注桩孔底沉渣厚度的检测与控制[J]. 工程质量, 2008(11): 33-35.(Zhang Zhihua, Ding Jie. Determination and control of the precipitation thickness at the bottom of bored cast-in-place pile[J]. Construction Quality, 2008(11): 33-35.)
    [13]王川婴, 韩增强, 王玉山. 钻孔灌注桩沉渣厚度检测方法研究[J]. 岩土工程学报, 2013, 35(S2): 1212-1215.(Wang Chuanying, Han Zengqiang, Wang Yushan. Detection method for bottom sediment thickness of bored piles[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(S2): 1212-1215.)
    [14]蒋建平, 汪明武, 高广运. 桩端岩土差异对超长桩影响的对比研究[J]. 岩石力学与工程学报, 2004(18): 3190-3195.(Jiang Jianping, Wang Mingwu, Gao Guangyun. Contrastive study on influence of difference of end rock-soil layer on super-long pile[J]. Chinense Journal of Rock Mechanics and engineering, 2004(18): 3190-3195.)
    [15]刘金波, 张中南, 孙 明, 等. 某桩基承载力不满足要求处理实例及分析[J]. 岩土工程学报, 2011, 33(S2): 58-63.(Liu Jinbo, Zhang Zhongnan, Sun Ming ,et al. Treatment and analysis of pile foundation without satisfying requirements of bearing capacity[J]. Journal of rock mechanics and engineering, 2011, 33(S2): 58-63.)
    [16]梅国雄, 胡铖波, 梅 岭. 利用桩底沉渣的桩基室内模型试验研究[J]. 岩石力学与工程学报, 2011, 30(S1): 3252-3259.(Mei Guoxiong, Hu Chengbo, Mei Ling. Indoor model test of pile foundation using sediment at pile bottom[J].Chinense Journal of Rock Mechanics and engineering, 2011, 30(S1): 3252-3259.)
    [17]张 毅, 甘 璐, 李红军. 深基坑地下连续墙护壁泥浆技术研究[J]. 施工技术, 2015, 44(19): 48-50+55.(Zhang Yi, Gan Lu, Li Hongjun. Research on slurry of diaphragm wall of deep foundation excavation[J]. Construction Technology, 2015, 44(19): 48-50+55.)
    [18]郑万栋, 申 翃, 靳利安, 等. 泥浆的有效静液压力及在泥浆护壁中的作用[J]. 土工基础, 2019, 33(06): 704-708.(Zheng Wandong, Shen Hong, Jin Lian. Effective Hydrostatic Pressure of Slurry and Its Role in Stabilizing the Slurry Wall Excavation[J]. Soil Engineering and Foundation, 2019, 33(06): 704-708.)
    [19]GB 50202—2018 建筑地基基础工程施工质量验收规范[S]. 2018. (GB50202—2018 Code for acceptance of construction quality of building foundation[S]. 2018. (in Chinese))
    [20]汤显政, 邓贵茂, 葛肖洁. 振动分砂器配合旋流除砂器在滨海桥梁桩基钻孔除砂中的应用[J]. 公路交通科技(应用技术版), 2017, 13(05): 39-40.(Tang XianZheng, Deng Guimao, Ge Xiaojie. Application of vibration sand separator and cyclone sand remover in drilling of pile foundation of Binhai bridge[J]. Journal of Highway and Transportation Research and Development, 2017, 13(05): 39-40.)
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation
Share
Article Metrics
  • Abstract:1060
  • PDF: 839
  • HTML: 314
  • Cited by: 0
History
  • Received:April 29,2020
  • Revised:September 02,2020
  • Adopted:June 29,2020
  • Online: October 23,2020
Article QR Code