Research and development of real-time monitoring equipmentfor drilling local area network
CSTR:
Author:
Affiliation:

1.Qingdao Harbour Vocational and Technical College, Qingdao Shandong , China;2.Shandong Province Dongying Ronglida Petroleum Equipment Co, Ltd, Dongying Shandong , China

Clc Number:

P634;TE92

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to realize remote monitoring of the drilling process at each drilling station by the drilling headquarters, on the basis of the single station for automatic real-time drilling monitoring developed in the early stage, TIA portal software was applied to develope the master-slave station for drilling monitoring with Siemens1200PLC used as the master control equipment, and Siemens200PLC as the slave control equipment to monitor the drilling parameters at each drilling station. Master-slave controlling is realized through the configuration of the master control equipment and slave control equipment at each station. Internet was used to test transmission after the master-slave station was set up, and the results showed that internet can provide continuous transmission from breakpoint and short-distance transmission of real-time monitoring data on drilling.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 27,2020
  • Revised:September 13,2020
  • Adopted:October 27,2020
  • Online: December 22,2020
  • Published:
Article QR Code