Quality control measurements for solution mining with intersected well sets of Kazan Trona Mine in Turkey
Author:
Affiliation:

1.Institute of Exploration Techniques, CAGS, Langfang Hebei , China;2.Liaoning Northeast Coalfield Geology Team Co, Ltd, Liaoyang Liaoning , China

Clc Number:

P634.7;TD87

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The requirement on the quality control in the technical specifications is very strict for drilling of the solution mining intersected well sets at Kazan Trona Mine. The vertical wells were easily deviated, with low core recovery and poor cement bonding due to the complex geology, the high dip angle of the formation, and presence of several aquifers; meanwhile, for the horizontal well, it was very difficult to control the trajectory. After a thorough analysis of data obtained from previously drilled wells and a study of related issues and optimization of solutions, several measurements were put forward and applied. The results showed that all the drilling problems were effectively solved, the drilling process was improved, and the construction period was reduced. The experience acquired from the project could be used as reference for the similar works.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 01,2020
  • Revised:July 15,2020
  • Adopted:July 16,2020
  • Online: August 19,2020
  • Published: