Construction of large diameter bored piles in massive sand formation for a Dadu River Bridge
CSTR:
Author:
Affiliation:

1.Chengdu Prospecting Machinery Factory, Chengdu Sichuan 610083, China;2.403 Geological Team, Sichuan Bureau of Geology and Mineral Exploration and Development,Ermeishan Sichuan 614200, China;3.Sichuan Institute of Geological Engineering Investigation Group Co., Ltd., Chengdu Sichuan 610072, China

Clc Number:

U445.55+1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The 12 bored piles for the 2# pier of the Dashu Dadu River Bridge in Hanyuan county have a diameter of 2500mm and a depth of 63~75m, posing some construction difficulty due to large diameter and great depth and drilling in massive sandy gravel formation below the river water level. There are multiple layers of sand and pebble soil overlying the bedrock at the 2# pier, and the sand layer is very thick. Sandy soil prevails between 11.5~49.4m except for a layer of 5.5m thick gravel cobble with soil inclusion, which is very disadvantageous to drilling of pile boreholes. Percussion drilling was used to sink the holes with the mud purification device to remove cuttings; meanwhile, some technical measures were adopted to ensure successful completion of the works, such as control of the bit diameter, use of the inner casing, control of the tremie pipe buried depth during concreting. The relevant technical measures can provide reference for other similar projects.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 17,2020
  • Revised:October 29,2020
  • Adopted:December 31,2020
  • Online: July 20,2021
  • Published: July 10,2021
Article QR Code