Drilling technology for D15 geothermal exploration well in Xiong’an New Area
Author:
Affiliation:

1.Institute of Exploration Techniques, CAGS, Langfang Hebei 065000, China;2.The Institute of Hydrogeology and Environmental Geology, CAGS, Shijiazhuang Hebei 050061, China;3.No. 3 Hydrological and Engineering Geology Team, Hebei Provincial Bureau of Geology and Mineral Resources, Hengshui Hebei 053000, China

Clc Number:

P634;TE249

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to explore the geothermal resources in the Rongcheng geothermal field, the Geological Survey of China has deployed a geothermal exploration well D15 in Xiong’an New Area with the design depth of 3000m and the completion depth 3111.58m. It is intended to reveal the development of the strata in the northern slope zone of the Rongcheng uplift and serve the geothermal development planning of Xiong’an New Area. This paper describes the drilling achievements, including completion of the drilling tasks, assurance of drilling quality; and summarizes hydrothermal well drilling fluid technology, selection of the coring tools, and acquisition of the physical data such as core, cuttings and other. Perforation operation was performed for pumping test to obtain formation parameters on water temperature and volume so as to provide data for the investigation and evaluation of geothermal resources in Xiong’an New Area.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 11,2020
  • Revised:February 01,2021
  • Adopted:February 02,2021
  • Online: March 22,2021
  • Published: March 10,2021