Small diameter deep core drilling method for difficult formation in a Tin mine
CSTR:
Author:
Affiliation:

1.Second Team of Hunan Nonferrous Metals Geological Exploration Bureau, Xiangtan Hunan 411100, China;2.217 Team of Hunan Nonferrous Metals Geological Exploration Bureau, Hengyang Hunan 421001, China

Clc Number:

P634.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In view of the complex formation of ZK2401 borehole in Tanjiachong mining area of Stannary in Lengshuijiang City, the drilling construction of every single borehole is carried out as a system engineering, and the controllable part is controlled reasonably and effectively, so as to be prepared to move and improve the rate of borehole formation. This paper summarizes the drilling construction methods from four aspects: preliminary investigation, drilling structure design and drilling equipment selection, drilling engineering design and actual construction situation, in order to ensure the smooth deep hole drilling of small diameter in complex strata of mining area, and the experience can be used as reference for peers.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 19,2021
  • Revised:May 21,2021
  • Adopted:July 08,2021
  • Online: December 06,2021
  • Published: September 01,2021