1.Institute of Exploration Techniques, CAGS, Langfang Hebei 065000, China;2.Sixth Geological Exploration Brigade, Shandong Geology and Mineral Survey, Weihai Shandong 264209, China
Clc Number:
P634
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
Hydraulic fracturing to exploit hot dry rock resources is the preferred method at present,based on its application status and characteristics, this paper analyzes the technical problems and many uncertain factors in the application of hydraulic fracturing technology to development of hot dry rock resources. The combined development scheme of horizontal docking for injection well with fracturing and horizontal docking scheme of injection-production wells are put forward, the technical feasibility of the two schemes is analyzed.