Research and practice of grouting reinforcement technology for the receiving end of shield tunneling in water-rich fine sand layers
CSTR:
Author:
Affiliation:

1.Hubei Shuizong Water Resources and Hydropower Construction Co., Ltd., Wuhan Hubei 430056, China;2.Sichuan Gotone Geotechnical Technology Co., Ltd., Chengdu Sichuan 610091, China

Clc Number:

U455

  • Article
  • | |
  • Metrics
  • |
  • Reference [16]
  • | | | |
  • Comments
    Abstract:

    The strata where the receiving end of air shaft shield is located in a subway section of the North China Plain is mainly silty clay, clayey silt and silty fine sand from top to bottom, with high underground water level and strong liquidity. After being reinforced by high-pressure rotary jet grouting at the receiving end, it was found that there is still a risk of water and sand inrush using horizontal exploration holes. The water and sand surging is easy to happen in the gap between the tunnel doors when the cutterhead of the shield tunneling machine break through the tunnel door. To ensure the shield machine smoothly passing out of the tunnel, the method of surface sleeve valve pipe grouting is adopted, and the GX modified silicon grouting material is used to consolidate the fine sand. Targeted reinforcement grouting is carried out in the receiving end of the interval air shaft within the water-rich fine sand formation. After treatment by such technology, the shield machine successfully excavated without any water or sand inrush.

    Reference
    [1] 安宏斌,怀平生,白晓岭,等.无端头加固条件下土压平衡盾构水下接收施工技术[J].隧道建设,2019,39(10):1697-1703.AN Hongbin, HUAI Pingsheng, BAI Xiaoling, et al. Construction technology of underwater receiving of EPB shield under condition of no-end reinforcement[J]. Tunnel Construction, 2019,39(10):1697-1703.
    [2] 周诚,余群舟,杨俊.地铁越江泥水盾构到达接收渗漏风险控制技术[J].铁道工程学报,2016,33(3):99-104.ZHOU Cheng, YU Qunzhou, YANG Jun. Risk control technology of leakage accident for the subway arriving[J]. Journal of Railway Engineering Society, 2016,33(3):99-104.
    [3] 温良涛.软弱富水砂层地质条件下土压平衡盾构接收施工技术[J].探矿工程(岩土钻掘工程),2019,46(6):88-93.WEN Liangtao. Receiving process for earth pressure balanced shield in soft water rich sand formation[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2019,46(6):88-93.
    [4] 唐京生.浅谈盾构始发与接受端加固方法的研究[J].中国设备工程,2018(8):122-123.TANG Jingsheng. Research on reinforcement methods for the starting and receiving ends of shield tunnels[J]. China Plant Engineering, 2018,(8):122-123.
    [5] 丁跃军.粉细砂地层防渗帷幕综合施工方法[J].探矿工程(岩土钻掘工程),2015,42(4):76-78.DING Yuejun. Comprehensive construction method of anti-seepage curtain in silt and fine sand layer[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2015,42(4):76-78.
    [6] 殷黎明.砂卵石地层盾构始发端头土体加固研究[D].长沙:中南大学,2013.YIN Liming. Study on the reinforcement of soil for shield launching in sandy pebble stratum[D]. Changsha: Central South University, 2013.
    [7] 齐俊修,赵晓菊,张广禹,等.粉细砂渗、透渗透变形参数统计分析研究[J].地下空间与工程学报,2015,11(S2):419-424.QI Junxiu, ZHAO Xiaoju, ZHANG Guangyu, et al. Statistical analysis and study on silty-fine sand permeability and permeability deformation parameter[J]. Chinese Journal of Underground Space and Engineering, 2015,11(S2):419-424.
    [8] 高成梁,梁小强.旋喷桩在盾构法隧道端头井洞口土体加固工程中的应用[J].探矿工程(岩土钻掘工程),2009,36(12):69-72.GAO Chengliang, LIANG Xiaoqiang. Application of high-pressure spiral jet grouting piles in shield tunnel portal soil reinforcement engineering[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2009,36(12):69-72.
    [9] 王博.复杂地层中地铁盾构接收端头加固技术研究[J].四川水泥,2021(6):231-233.WANG Bo. Research on reinforcement technology for receiving end of metro shield tunnels in complex strata[J]. Sichuan Cement, 2021(6):231-233.
    [10] 冯慧君.天津地铁红星路站盾构端头井水平注浆加固技术[J].施工技术,2009,38(9):11-12.FENG Huijun. Horizontal grouting reinforcement technology of shield end well in Hongxing Road Station of Tianjin Metro[J]. Construction Technology, 2009,38(9):11-12.
    [11] 潘希军.粉细砂层中锚索施工涌水涌砂的处理技术[J].探矿工程(岩土钻掘工程),2020,47(10):72-76.PAN Xijun. Treatment of water and sand kicks in silty fine sand in anchor cable construction[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2020,47(10):72-76.
    [12] 周小杰.富水粉细砂地层大断面隧道围岩稳定性及注浆加固效果研究[D].成都:西南交通大学,2022.ZHOU Xiaojie. Study on stability of surrounding rock and effectof grouting reinforcement for large section tunnels in water rich silty-fine sand strata[D]. Chengdu: Southwest Jiaotong University, 2022.
    [13] 茆俊飞.暗挖隧道粉细砂层注浆加固施工技术[J].工程与建设,2019,33(3):437-438,449.MAO Junfei. Construction technology for grouting reinforcement of fine sand layer in underground tunnels[J]. Engineering and Construction, 2019,33(3):437-438,449.
    [14] 王晓亮,侯伟清,叶子剑,等.北京地铁10号线二期某区间粉细砂地层帷幕注浆效果评价研究[J].施工技术,2014,43(1):114-117.WANG Xiaoliang, HOU Weiqing, YE Zijian, et al. A slity sand stratum curtain grouting effects evaluation research on the second stage of Beijing Subway Line 10[J]. Construction Technology, 2014,43(1):114-117.
    [15] 何鑫,王胜,何烨,等.富水砂卵石层堵漏凝胶的研制及其机理[J].钻探工程,2023,50(1):142-149.HE Xin, WANG Sheng, HE Ye, et al. Development and mechanism of plugging gel for water-rich sand and gravel formations[J]. Drilling Engineering, 2023,50(1):142-149.
    [16] 李洪财.南京长江江心洲超大直径盾构接收井明挖段超深基坑降水技术研究[J].探矿工程(岩土钻掘工程),2018,45(5):87-92.LI Hongcai. Study on dewatering technology of ultra-deep foundation pit in opening cut section of super-large diameter shield receiving well in River Island of Nanjing Yangtze River[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2018,45(5):87-92.
    Related
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation
Share
Article Metrics
  • Abstract:41
  • PDF: 2116
  • HTML: 32
  • Cited by: 0
History
  • Received:December 05,2023
  • Revised:February 25,2024
  • Adopted:February 26,2024
  • Online: October 08,2024
Article QR Code