Exploration of Winter Construction Drilling Technology in Shenjing Coal Exploration Area, Zhongwei City, Ningxia ProvinceHE Yuyun1, XIONG Zhenqiang2,ZI Bing1,CAO xuebing1,ZHANG Xuejin1,
DOI:
Author:
Affiliation:

1.Ningxia nuclear Geological Survey Institute;2.Beijing Institute of Exploration Engineering

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The Ningxia Nuclear Geological Survey Institute conducted winter drilling and construction of the coal resource exploration project, an urgently needed local mineral resource project for energy supply, in the Shenjing block of Xiangshan Township, Zhongwei City, Ningxia from November 2022 to March 2023. The lowest temperature in the working area was -21 ℃. During the construction period, the drilling construction was greatly challenged due to the influence of low temperature and strata fragmentation. The main coal seams were mainly fine coal, and the difficulty of coring was high. By using a low-temperature resistant flushing fluid system Reasonable maintenance of drilling rig diesel engines and other equipment, optimization of drilling tool combinations, and improvement of cold and heating conditions for construction personnel have successfully completed drilling winter construction, with an average monthly efficiency of 811.8m/month.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 13,2024
  • Revised:June 03,2024
  • Adopted:June 06,2024
  • Online:
  • Published: