Research and application of the one shot blasting pilot hole sinking method for the shaft
Author:
Affiliation:

Zhejiang Tunnel Engineering Group Co., Ltd., Hangzhou Zhejiang 310013, China

Clc Number:

TD235

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In relation to the gate shaft excavation at a water conservancy project where the excavation size is 2 m×2 m for the shaft pilot hole, this paper introduces a new excavation method-the one shot blasting method for sinking of the central pilot hole with emphasis on the technical measures on how to complete the central pilot hole by one-time blasting. With this method, one shot blasting for the central pilot hole is combined with expanding excavation around the hole. The deep hole blasting method is adopted for excavation. Through the design of the blasting scheme, preparation before construction, mechanical drilling, charging, wire connection, blasting, safety inspection after blasting and other processes, the central pilot hole is first excavated and shaped by one shot blasting, and then it is expanded and shaped by shallow hole multi-cycle blasting through the surrounding rock from top to bottom, and finally the central pilot hole is formed.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 17,2021
  • Revised:June 17,2021
  • Adopted:July 11,2021
  • Online: December 06,2021
  • Published: September 01,2021